Yacht Mast at GCMC
The Davo’s team sailing through this full extension lift this arvo to replace the mast on the beautiful yacht at The Gold Coast Marine Centre. ⚓️
Brief: Raise new mast and hold while engineering team connect electrics and then secure to vessel.
Crane: TEREX DEMAG 3160 (60T)